Skip to content

Routings overview ​

Goal ​

Understand routings as ordered operation sequences (setup/run minutes and optional work center) that can be linked on a BOM and snapshotted onto a work order.

Who it is for ​

manufacturing.view to browse; manufacturing.manage to create/edit.

How they fit ​

  1. Define operations with Sequence, optional Work centers, Operation name, Setup (min), Run (min).
  2. Attach a routing on a BOM (or leave No routing).
  3. Creating a work order copies routing operations onto the WO; shop floor uses Apply to book labor/overhead into WIP.

Open the screen ​

Production → Routings.

BlueMatrix Help — product documentation for tenants